Integrated Concrete Form (ICF) construction Limerick

A low-energy project involves a floor area of 250m²

Integrated Concrete Form (ICF) construction Limerick

A integrated concrete form (ICF) construction project within the low-energy projects category involves a floor area of 250m². The construction utilizes integrated concrete form (ICF) construction and is located in Co. Limerick. The project was supplied by Thermohouse in Killarney.

Key details of the project:

Construction details:

  • Floor area: 250m²
  • Construction method: Integrated Concrete Form (ICF) construction.
  • Location: Co. Limerick.
  • Supplied by Thermohouse in Killarney.

Heating system:

  • Nilan Compact P heat pump with 2KW back-up duct heater: The Nilan Compact P system is installed, featuring a heat pump with a 2KW back-up duct heater. This system is designed to provide both ventilation, hot water production and heating.
  • Solid fuel stove in living room: Additionally, a solid fuel stove is installed in the living room, providing supplemental heating.

The project showcases a commitment to low-energy construction practices, utilizing Integrated Concrete Form construction for enhanced insulation and energy efficiency. The installation of Nilan Compact P with a heat pump, back-up duct heater, and a solid fuel stove aligns with the goal of providing energy-efficient ventilation and heating solutions. The combination of innovative construction methods and heating technologies contributes to creating a comfortable living environment for the occupants.